Hard Rock Quarry WHS management plan โ€” authored to order for NSW, quoted within one business day
โ† All industry WHS management plans
Work Health and Safety Act 2011 (NSW) ยท Work Health and Safety Regulation 2025 (NSW)

Hard Rock Quarry WHS management plan (NSW)

The WHS system a tender panel, principal contractor or insurer asks to see: policy, plan, a 10-hazard risk register written for hard rock quarries and mobile crushing and screening operators, procedures, registers and an emergency plan. Editable Word, written by a Certified Industrial Hygienist.

๐Ÿ“ Written for NSW๐Ÿ• Quoted within one business day๐Ÿ“ Editable Word
In preparation

Authored to order for your business and quoted within one business day. When the pack for this industry is released it will be sold here as a download.

Request this plan โ€” quote within one business day

Tell us your business name, sites and the tender or client you are preparing for. A Certified Industrial Hygienist replies within one business day.

Different kind of business? See every industry

Editable Microsoft Word, your business written in
10-hazard industry risk register
Tender and prequalification cover sheet
CIH-authored ยท WHS Regulation 2025 (NSW)
10 documents10 hazards in the register7 control documentsRegulator: SafeWork NSW
What the plan contains

The 10 documents in the plan

The policy and plan govern the system; the register, procedures and registers are written for this industry from the hazard content we already hold for it.

01Plan document

WHS Policy

signed statement of commitment, objectives and responsibilities

02Plan document

WHS Management Plan

scope, roles, consultation, risk management process and review cycle

03Plan document

Industry hazard and risk register

every hazard of this work with its starting rating and required controls

04Plan document

Safe work procedures

written for the high-risk work of this industry

05Plan document

Induction, training and competency registers

who has been inducted, trained and verified competent

06Plan document

Workplace inspection, plant and equipment registers

scheduled inspections and their findings

07Plan document

Incident, hazard report and corrective action registers

what happened, what was done, who closed it

08Plan document

Emergency plan and drill record

response, contacts, assembly and drills

09Plan document

Contractor and subcontractor management section

prequalification, induction and supervision

10Plan document

Tender and prequalification cover sheet

where each panel requirement is answered in the plan

โœ“Built on the quarry pack's 7 control documents, including master SOP; explosives Handling, Blast Design & Shotfiring Safety Standard; respirable Crystalline Silica (RCS) Health Monitoring & Exposure Control Protocol.

โœ“Editable Microsoft Word throughout, with your business name, ABN, sites and responsible people written in.

Why quarry needs its own WHS management plan

What this pack is

A WHS management plan is the document a council tender panel, a principal contractor or an insurer asks for before your SWMS: the policy, the responsibilities, the way hazards are found and controlled, and the registers that prove the system runs. A generic plan names none of the work hard rock quarries and mobile crushing and screening operators actually do.

The hazard register is drawn from our quarry compliance pack: 10 leading hazards, each with the control documents that answer it.

The plan is authored to order for your business by a Certified Industrial Hygienist and quoted within one business day. When the pack for this industry is released it will be sold here as an editable Word download.

The complete pack

Hard Rock Quarry

WHS management plan for hard rock quarries and mobile crushing and screening operators in New South Wales: WHS policy, management plan, the industry hazard and risk register (10 hazards), safe work procedures, induction, inspection, incident and emergency registers, and a tender and prequalification cover sheet. Editable Word.

  • โœ“WHS policy and management plan with roles, responsibilities and consultation written in
  • โœ“Industry hazard and risk register โ€” 10 hazards with their starting ratings and required controls
  • โœ“Safe work procedures for the high-risk work of this industry
  • โœ“Induction, training, inspection, incident and emergency registers
  • โœ“Tender and prequalification cover sheet mapping each panel requirement to the plan
In preparation

Authored to order for your business and quoted within one business day. When the pack for this industry is released it will be sold here as a download.

Request this plan โ€” quote within one business day

Tell us your business name, sites and the tender or client you are preparing for. A Certified Industrial Hygienist replies within one business day.

Different kind of business? See every industry

Editable Microsoft Word, your business written in
10-hazard industry risk register
Tender and prequalification cover sheet
CIH-authored ยท WHS Regulation 2025 (NSW)
The risk

The hazards the register is built around

A sample of the 10 hazards in the quarry register, with the consequence and, where our calculator rates it, the starting risk given by a Certified Industrial Hygienist before any controls are counted.

Flyrock ejection and blast overpressure during production shotfiringHigh

Uncontrolled rock projection beyond blast perimeter or stemming blow-out strikes plant, light vehicles, or personnel; catastrophic blunt force trauma or fatalities.

Respirable Crystalline Silica (RCS) inhalation from crushing, screening, and drillingHigh

Inhalation of micro-quartz particles (<10 ยตm) leading to irreversible silicosis, pulmonary fibrosis, lung cancer, and chronic obstructive pulmonary disease (COPD).

Haul truck rollover or collision with light vehicle on quarry haul roadsHigh

Brake failure, soft road edge collapse, or visibility blind spots result in 50t+ haul truck crushing light vehicle or overturning over a haul road bench.

Crusher hopper bridging and dangerous manual unjammingHigh

Worker entering feed hopper or using handheld pry-bars to dislodge oversized rock; sudden collapse or inadvertent crusher start causes fatal entrapment and crushing.

Highwall face failure or bench crest collapseHigh

Geotechnical joint slip or rain-induced structural failure causes hundreds of tonnes of rock to fall onto excavators or drill rigs operating below.

Conveyor nip point entanglement and pulley entrapmentHigh

Worker drawn into return rollers, tail drums, or transfer chute conveyors during manual belt cleaning or alignment while plant is running.

Stockpile slump and loader engulfmentHigh

Reclaim tunnel collapse or vertical stockpile undermining causes sudden bulk aggregate slide, burying earthmoving plant or operators.

Misfire or unexploded ordnance during post-blast excavationHigh

Excavator bucket impacts undetonated booster or electronic detonator in rock muck-pile, causing accidental secondary explosion.

In this industry

What a quarry WHS management plan has to cover, from the blast pattern to the load-out

A hard rock quarry runs a chain of high-energy work every shift: pattern drilling and shotfiring, loading the muck-pile, hauling on benched roads, primary and secondary crushing, screening and conveying, and road load-out. Mobile crushing and screening operators carry the same chain from site to site. The plan has to hold the statutory roles of quarry manager and site senior executive, a daily-to-annual compliance calendar, permit-to-work interfaces, pre-start plant audits, contractor management and management of change.

The risk register is led by a short list of things that kill people in pits. Flyrock and blast overpressure reach beyond the perimeter. Misfires wait in the muck-pile for an excavator bucket. Haul trucks roll over soft edges or crush light vehicles in blind spots. Highwalls and bench crests fail after rain, stockpiles slump onto loaders, and workers climb into a bridged crusher hopper or reach into conveyor nip points while the plant is running. Behind all of it sits respirable crystalline silica from drilling, crushing and screening granite, basalt, quartzite and rhyolite.

A generic construction WHSMP has nowhere to put any of this. It has no blast exclusion or misfire clearance procedure, no haul road berm and intersection rules, no highwall inspection or face scaling protocol, no zero-energy lockout for crushers and screens, and no silica monitoring and health surveillance under Part 8.8A of the WHS Regulation 2025 (NSW). A quarry plan starts from those.

What a council panel, principal or insurer turns to in a quarry plan

A council buying aggregate, or a principal bringing a mobile crushing crew onto its site, opens the signed WHS policy first and then goes straight to the hazards that worry them most. For a pit that is usually blasting and flyrock, haul road traffic around their own trucks, and face stability. The plan gives them a register that names each hazard, its starting rating and the controls required, cross-referenced to the safe work procedures behind it.

Because silica is a health hazard at every quarry, reviewers look for air monitoring and health surveillance records, not just a line about dust masks. The plan sets out where sampling sits and how the surveillance register is kept. Contractor management shows how drillers, shotfirers and haulage subcontractors are prequalified, inducted and supervised, and the emergency plan with its drill record shows what happens after a blast incident, a rollover or a rockfall. The tender cover sheet points each panel question to the page that answers it.

What goes wrong at a quarry that runs without a written plan

The common first failure is commercial. A council supply tender asks for a WHS management plan and evidence of silica controls, and you send a folder of pre-start checklists. The panel marks the submission non-conforming and the contract goes to a quarry down the road that sent a plan. A principal stops your crushing crew at the induction when it cannot show how conveyor isolation is managed.

The second failure happens on the bench. A loader driver is sent to clear a bridged hopper with a pry-bar because that is how it has always been done, or an operator walks the conveyor to knock off build-up with the belt still turning. Nobody wrote down that this task needs isolation, so nobody checked. When the injury happens, your supervisors are asked which procedure applied and there is none to show.

The third is the conversation with the regulator after a notifiable incident: a flyrock strike outside the exclusion zone, a misfire found by an excavator, a truck over a berm. The inspector asks for the blast design, the exclusion records, the haul road standard and the training register. A written plan with its registers supports your due diligence case; its absence leaves your site explaining practice from memory.

Who it's for

Built for the people who do this work

If you operate, maintain or contract to these assets in NSW, this pack is written for your duties.

  • โœ“Hard rock quarries and mobile crushing and screening operators
  • โœ“Businesses applying for council, government or principal-contractor prequalification
  • โœ“Owners and managers who need a WHS system that stands up to a SafeWork NSW visit
  • โœ“Businesses whose insurer or main client has asked for a documented WHS management plan
Compliance basis

Authored to the codes and the law

The Codes of Practice and Australian Standards these documents are measured against, and the legislation behind them.

Related legislation
  • ยงWork Health and Safety Act 2011 (NSW) โ€” primary duty of care, consultation, officer due diligence
  • ยงWork Health and Safety Regulation 2025 (NSW) โ€” risk management, hazardous chemicals, health monitoring, plant
  • ยงHow to manage work health and safety risks โ€” Code of Practice (SafeWork NSW)
  • ยงWork health and safety consultation, cooperation and coordination โ€” Code of Practice (SafeWork NSW)
  • ยงManaging the work environment and facilities โ€” Code of Practice (SafeWork NSW)
Questions

Frequently asked questions

Ask for the plan today; sign it off this month.

Send the enquiry with your business name and the tender or client you are preparing for. You will have an itemised quote within one business day and a plan written for your work, not a template with the name changed.

Request this plan โ€” quote within one business day

Authored to order for your business and quoted within one business day. When the pack for this industry is released it will be sold here as a download.

A WHS management plan supports your due diligence; holding one is not compliance in itself. You must run the system it describes โ€” consult your workers, put the controls in place, keep the registers current and review the plan after any incident or change. Exposure monitoring and health monitoring, where the register calls for them, are work for an occupational hygienist and a registered medical practitioner.