OH Consultant
Compliance Packs›Flour Dust Compliance Pack›Hierarchy of Controls Register — Café
Safe Work Australia · 0.5 mg/m³ WEL · effective 1 Dec 2026

Hierarchy of Controls Register — Café

Structured hierarchy of controls for flour dust in café environments: elimination, substitution, engineering (LEV, enclosure), administrative (task rotation, cleaning protocols), and PPE.

Price
$145AUD

Edition · cafe

About this document

Structured hierarchy of controls for flour dust in café environments: elimination, substitution, engineering (LEV, enclosure), administrative (task rotation, cleaning protocols), and PPE.

What's inside

  • ✓Five-level hierarchy: elimination → substitution → engineering → admin → PPE
  • ✓Right-sized controls for café vs industrial bakery context
  • ✓Cross-reference column linking to relevant SOPs
  • ✓Editable Microsoft Word format

Ready when you are

Instant download after payment. Editable Word/Excel. Single-site licence. 12 months of regulatory updates.

← Back to Flour Dust Compliance Pack